About us
News & events
Careers
Contact
EN
EN
FR
Products
PMP TeamMate
PMP WeSaw
PMP WeDry
PMP WePlane
PMP WeTrack
PMP WeSchedule
All products
Applications & initiatives
Improve inventory precision and levels
Increase lumber recovery
Increase lumber quality
All Applications & initiatives
Case studies
Resources
Compare solutions
Calculate your gains
Media library
Support
get a quote
SEE HOW MUCH YOU COULD GAIN BY USING PMP SOLUTIONS TOOLS
Use our calculator to gain insights into what you could gain by using our software.
CLOSE
SIMULATION REPORT REQUEST
Name
*
First Name
Last Name
Company
*
Occupation
*
-Select-
Other
Director
Manager
Operator
Owner
Other Occupation
E-mail
*
I agree to receive other communications from PMP SOLUTIONS.*
Refer to our privacy policy to find out more about how we manage your personal information. You can unsubscribe from these communications at any time.
By clicking
Submit
you authorize PMP SOLUTIONS to store and process the personal information provided above to supply the requested content and / or services.
Some required fields are still empty.
Submit
Thank you! Your request was successfully submitted.
Current situation
Prices
Market price ($/MFBM)
High grades ($/MFBM)
Low grades ($/MFBM)
Distributions
High grades (%)
Low grades (%)
Other parameters
Labor ($/h)
Availability (%)
Productivity (%)
Trim loss (%)
Operating time (h/yr)
Volume (MMFBM/yr)
Contribution margin (%)
i
The contribution margin (CM) or dollar contribution per unit is the selling price per unit minus the variable cost per unit. "Contribution" represents the portion of sales revenue that is not consumed by variable costs and so contributes to the coverage of fixed costs.
Simulation
Low grade
decrease (%)
High grade
increase (%)
Availability
increase (%)
Productivity
increase (%)
Trim loss
decrease (%)
Grade distribution
MFBM
$
Profits
{{ additionalProfitsYear | zero | thousands | dollars }}
/yr
{{ additionalProfitsShift | zero | thousands | dollars }}
{{ additionalProfitsPercent | one | percent }}
/shift
Current situation
Simulation
Low grades
MFBM
$
{{ productionLg | zero | thousands }}
{{ incomeLg | zero | thousands | dollars }}
{{ productionLgNew | zero | thousands }}
{{ incomeLgNew | zero | thousands | dollars }}
Medium grades
MFBM
$
{{ productionMg | zero | thousands }}
{{ incomeMg | zero | thousands | dollars }}
{{ productionMgNew | zero | thousands }}
{{ incomeMgNew | zero | thousands | dollars }}
High grades
MFBM
$
{{ productionHg | zero | thousands }}
{{ incomeHg | zero | thousands | dollars }}
{{ productionHgNew | zero | thousands }}
{{ incomeHgNew | zero | thousands | dollars }}
Labor cost saving
{{ laborSavings | zero | thousands | dollars }}
Revenues
{{ totalIncome | zero | thousands | dollars }}
{{ totalIncomeNew | zero | thousands | dollars }}
Profits
{{ additionalCosts | zero | thousands | dollars }}
{{ additionalProfitsYear | zero | thousands | dollars }}
SEND ME THESE RESULTS
Reset simulation
QUESTIONS?
COMMENTS?
GET IN TOUCH
©
2021
PMP Solutions
- All right reserved.
Created by
CLOSE
EN
EN
FR
Products
PMP TeamMate
PMP WeSaw
PMP WeDry
PMP WePlane
PMP WeTrack
PMP WeSchedule
All products
Applications & initiatives
Improve inventory precision and levels
Increase lumber recovery
Increase lumber quality
All Applications & initiatives
Case studies
Resources
Compare solutions
Calculate your gains
Media library
Support
Menu
About us
News & events
Careers
Contact
close
get a quote
CLOSE
CLOSE
CLOSE
CLOSE
CLOSE
close
arrow-circle-o-down
angle-down
ellipsis-v
cross
EN
EN
FR
EN
EN
FR
linkedin
facebook
pinterest
youtube
rss
twitter
instagram
facebook-blank
rss-blank
linkedin-blank
pinterest
youtube
twitter
instagram